Skip Ribbon Commands
Skip to main content
Navigate Up
Sign In
 
 
             
 
               
             
  The Suralaya Generation Business Unit (GBU) is one of the PT Indonesia Power's generating stations. It is the largest coal fired station in Indonesia.

Suralaya GBU has built 7 (seven) coal fired steam powerplant unit in three phases.

1st phase= 2 Units has operating at 1984
2nd phase= 2 Units has operating at 1989
3rd phase= 3 Units has operating at 1997

Suralaya GBU has been built on 239 hectare area that consist of 116 hectare for Central Building, Ashvalley, and official housing, and the rest is forests for producing fresh air.

With its 3.400 MW installed capacity, Suralaya GBU has a key role as prime over the development, science achievement and education.
 
     
     
 
<>
     
Suralaya Generation Business Unit
Jl. Komplek PLTU Suralaya, Serang, Merak 42456, Indonesia
Tel. (62-254) 571230, 571240, 571243, 571242
fax. (62-24) 571235